Mobile Home Foundations
Development Permits
Development Permits are required for the protection of certain lands, in particular lake properties, prior to obtaining a permit for a mobile home foundation. Click on the following link for more information on Development Permits.
Zoning
Applicants must confirm with the Planning Department that zoning corresponds with building plans. Click on the following link for more information on Zoning Bylaws.
Onsite Sewage
A copy of the Record of Sewerage System filed with the Northern Health Authority is required. Contact information for the Northern Health Authority is:
Northern Health Authority
4th Floor, 1600 Third Avenue
Prince George, BC V2L 3G6
Phone: 565-2150 Fax 565-2144
Approval of the installation of the sewage disposal system is required prior to a final building inspection.
Application Form
Click on the following link to download a copy of the Application to Construct, Alter, or Repair a Building or Structure. If you require assistance in completing the form, please call our service centre at 960-4400 or 1-800-667-1959.
Site Plan
A site plan is required showing the location of the dwelling, driveway and/or access road, property lines, accessory building and measurements from the new building to property lines. Click on the following link for a sample site plan.
Mobile Home Foundation Requirements
Plans for concrete, belled piers, in metric or imperial measure, are required and are to include:
- a typical section
- footing plan
- tie-down detail
- anchor detail
- support detail
Click on the following link for sample manufactured home foundation construction details.
When ready for a final inspection, link to Final Inspection Requirements for Manufactured Homes to ensure that all items have been completed.
Permit Fees
Permit fees for manufactured home foundations are as follows:
- Single-wide $130.00
- Double-wide $184.00
Inspection Schedule
The owner or agent is responsible to call for inspections at the following stages, giving the inspector 48 hours notice:
(These inspections are mandatory, regardless of engineering.)
Piers: |
When excavation of piers is complete, prior to pouring concrete. |
Occupancy/ Final: |
When manufactured home foundation requirements are complete, prior to occupancy. Sewage system must be approved prior to final inspection. |